A NSW Government website

Water sharing plan status

Murrumbidgee region

Information about water sharing plans for the Murrumbidgee region.

Coonancoocabil Lagoon in the Murrumbidgee Valley National Park

About the region

The Murrumbidgee region is bordered by the Great Dividing Range to the east, the Lachlan catchment to the north and the Murray catchment to the south. The region covers over 84,000 km2.

The region is the traditional lands of the Barapa Barapa, Muthi Muthi, Nari Nari, Ngunnawal, Nyeri Nyeri, Wadi Wadi, Wolgalu, Wemba Wemba, Weki Weki, and Wiradjuri Nations.

The water sharing plans that apply to the surface water and groundwater resources of the Murrumbidgee region are listed below.

View all plans

Water Sharing Plan (WSP) Supporting documentation Commence date Cease date Prior Water Sharing Plan and status
Murrumbidgee Alluvial Groundwater Sources 2020
  • Status: In force

Murrumbidgee Alluvial Groundwater Sources 2020 – Plan map (WSP051_V1)

Murrumbidgee Alluvial Groundwater Sources 2020 – GDE map (GDE018_V1)

Rule summary sheets July, 2020 June, 2030 Lower Murrumbidgee Groundwater Sources 2019
  • Status: Replaced
  • Archived background document: N/A

Murrumbidgee Unregulated and Alluvial 2012

Murrumbidgee Regulated River Water Source 2016
  • Status: In force

Lowbidgee of the Murrumbidgee Regulated River Water Source – Plan map (WSP027_V2)

Changes to the Murrumbidgee Regulated River Water Sharing Plan (December 2022)

Compliance with water management principles (December 2022)
July, 2016 June, 2026 This plan has been amended since it commenced. See the NSW Legislation site for details.
Murrumbidgee Unregulated River Water Sources 2012
  • Status: In force (with two year extension)

Murrumbidgee Unregulated River Water Sources 2012 – Plan map (WSP023_V3)

Background document (2016) October, 2012 June, 2025 This plan has been amended since it commenced. See the NSW Legislation site for details
NSW Murray–Darling Basin Fractured Rock Groundwater Sources 2020
  • Status: In force

Murray Darling Basin Fractured Rock Groundwater Sources 2020 – Plan map (WSP012_V3)

Murray Darling Basin Fractured Rock Groundwater Sources 2020 – GDE map (GDE024_V3)

Rule summary sheets

Compliance with Water Management Principles (December 2021)

Compliance with Water Management Principles (May 2022)

July, 2020 June, 2030 This plan has been amended since it commenced. See the NSW Legislation site for details.

NSW Murray–Darling Basin Fractured Rock Groundwater Sources 2011
NSW Murray–Darling Basin Porous Rock Groundwater Sources 2020
  • Status: In force

Murray Darling Basin Porous Rock Groundwater Sources 2020 – Plan map (WSP013_V2)

Murray Darling Basin Porous Rock Groundwater Sources 2020 – GDE map (GDE023_V1)

Rule summary sheets July, 2020 June, 2030 NSW Murray–Darling Basin Porous Rock Groundwater Sources 2011