A NSW Government website

Tracking surface water extractions against extraction limits

LTAAEL compliance results

Current and archived surface water LTAAEL assessments.

Compliance against the Long Term Annual Average Extraction Limits

Current and archived surface water LTAAEL assessments are provided in the tables below.

Each water sharing plan specifies how LTAAEL compliance is to be assessed. For inland regulated water sharing plans and the Barwon-Darling unregulated plan, two models are required. One model represents the limit and one represents current conditions. The long-term results from both models are compared to assess compliance.

Fact sheet

Learn more about how the extraction limits work and differences.

Download the fact sheet (PDF. 652KB)

Guidelines

There is typically more than one version of each of these models. Read our guidelines for selecting the most appropriate scenario model for LTAAEL compliance.

Download the guidelines (PDF. 493KB)

A compliance assessment will be completed yearly for inland regulated and Barwon-Darling unregulated water sharing plans using the best available models. A risk-based strategy will be used to determine the extent and timing of updates to the current conditions models.

In other water sharing plans, LTAAEL compliance assessment will only be enabled when sufficient data becomes available through the non-urban water metering policy. This includes most unregulated and coastal water sharing plans.

Current assessments

Water source Period of data used LTAAEL compliance status Compliance action taken Further information
Border Rivers Regulated River 1895-2022 Compliant with commencement of floodplain harvesting licences Not required Compliance assessment
Gwydir Regulated River 1895-2022 Compliant with commencement of floodplain harvesting licences Not required Compliance assessment
Upper Namoi and Lower Namoi Regulated River 1895-2020 Non-compliant Yes (commencing 1 July 2023) Compliance assessment

FAQs for reduced supplementary water access allocations
Peel Regulated River 2011-2022 Compliant Not required Compliance assessment
Macquarie and Cudgegong Regulated Rivers 1895-2022 Compliant Not required Compliance assessment
Lachlan Regulated River 1895-2022 Compliant Not required Compliance assessment
Belubula Regulated River 1895-2022 Compliant Not required Compliance assessment
Murrumbidgee Regulated River 1895-2022 Compliant Not required Compliance assessment
Barwon-Darling Unregulated River 1895-2022 Compliant Not required Compliance assessment
New South Wales Murray Regulated River 1895-2022 Compliant Not required Compliance assessment
Lower-Darling Regulated River 1895-2022 Compliant Not required Compliance assessment
Greater Metropolitan Region Unregulated River 2012-2022 Non-compliant for Southern Sydney EMU - major utility access licence LTAAEL Not required – review is to be undertaken by the Minister Compliance assessment
Hunter Regulated River 1893-2013 Compliant Not required Compliance assessment

Archived assessments

Assessments completed in 2021-22

Water source Period of data used LTAAEL compliance status Compliance action taken Further information
Border Rivers Regulated River 1895-2021 Compliant with commencement of floodplain harvesting licences Not required.
Compliance action taken prior to commencement of floodplain harvesting licences.
Summary report
(PDF, 127.26 KB)

FAQs for reduced supplementary water access allocations (which applied from 1 July to 14 August 2022).

Gwydir Regulated River 1895-2021 Compliant with commencement of floodplain harvesting licences Not required.
Compliance action taken prior to commencement of floodplain harvesting licences.
Summary report (PDF, 127.3 KB)

FAQs for reduced supplementary water access allocations (which applied from 1 July to 14 August 2022).

Upper Namoi and Lower Namoi Regulated River 1895-2021 Compliant Not required. Summary report (PDF, 114.28 KB)
Peel Regulated River 1895-2021 Compliant Not required.Summary report (PDF, 107.27 KB)
Macquarie and Cudgegong Regulated Rivers 1895-2021 Compliant Not required.Summary report (PDF, 121.23 KB)
Lachlan Regulated River 1895-2021 Compliant Not required.Summary report (PDF, 113.66 KB)
Belubula Regulated River 1895-2021 Compliant Not required.Summary report (PDF, 93.3 KB)
Murrumbidgee Regulated River 1895-2021 Compliant Not required Summary report (PDF, 105.44 KB)
Barwon-Darling Unregulated River 1895-2021 Compliant Not required Summary report (PDF, 124.33 KB)
New South Wales Murray Regulated River    First assessment will be reported in 2022/23
Lower-Darling Regulated River    First assessment will be reported in 2022/23
Greater Metropolitan Region Unregulated River 2012-2021 Non-compliant for Southern Sydney EMU - major utility access licence LTAAEL Not required – review is to be undertaken by the Minister Summary report
(PDF, 92.35 KB)

Assessments completed in 2020-21

Water source Period of data used LTAAEL compliance status Compliance action taken Further information
Border Rivers Regulated River 1895-2009 Non-compliant Yes

Based on published results (PDF, 707.75 KB) under floodplain harvesting program.

FAQs for reduced supplementary water access allocations.

Gwydir Regulated River 1895-2009 Non-compliant Yes

Based on published results (PDF, 908.83 KB) under floodplain harvesting program.

FAQs for reduced supplementary water access allocations.

Macquarie and Cudgegong Regulated Rivers 1895-2009 Compliant Not required Based on published results (PDF, 790.53 KB) under floodplain harvesting program.
Barwon-Darling Unregulated River 1895-2019 Compliant Not required Read our assessment (PDF, 165.17 KB) to find out more.